Less cooling energy
Evaluate cooling demand against the workload and thermal conditions it serves. A useful comparison starts with an agreed baseline and suitable cooling measurements.
01 / OPERATIONS / COLOCATION / COMPUTE
Connect compute demand, thermal behavior and cooling decisions across your operating context.
For facility operators, enterprise teams and colocation customers, the starting point is the same: understand the signals you can access and the decisions you can influence.
01 / RELEVANCE
Evaluate cooling demand against the workload and thermal conditions it serves. A useful comparison starts with an agreed baseline and suitable cooling measurements.
Investigate changing thermal behavior in the context of compute load and cooling state. Use that context to guide maintenance questions and targeted investigation.
Keep measurement sources, model assumptions and proposed actions visible to the people responsible for operations.
02 / WHAT YOU RECEIVE
The temperature, load and cooling signals your systems provide, with measurement location, update rate and data quality. It also names the gaps that limit an evaluation.
Predictions of the thermal model set against your recorded operation, including load changes. The result states where the model fits and where its uncertainty increases.
An agreed system boundary, comparison period and set of documented conditions. A later statement about cooling energy can then be traced back to its measurements.
Calculated setpoints, such as coolant supply temperature and flow, presented with the limits they respect. They are reviewed as recommendations first. Direct actuation is a separate, explicitly approved step.
03 / INPUT DATA
Server telemetry typically comes from accelerator management tools and baseboard management controllers, cooling data from the facility or cooling-distribution systems. Which values exist, and how often they update, depends on your equipment. Not every group has to be available on day one.
04 / WORKING TOGETHER
Separate facility, cooling and tenant responsibilities. Establish which signals are available and who can approve access or operating changes.
Choose the operating questions, comparison period and measurement boundary. Review model behavior against the available recorded data.
Agree whether the project should provide analysis, recommendations or a separately approved control integration, together with limits and fallback behavior.
05 / FIRST CONVERSATION
BACKGROUND